Monday, July 19, 2010

The Dwelling...

July 19, 2010

The dwelling is coming along. Rough inspections for plumbing, structure, electricity are all done. The basement poles are all gone, the tiles are down, the walls are being plastered.

Oh this is so exciting! The contractor says 2 weeks and we can start moving in. Ok let's see... that probably means sometime in beginning of August that we can start putting stuff in.

Our lease ends on August 31, so it gives us a month to move into the place. Plenty of time... plenty of time.

Hubby called the pool table guy and left a message. Hopefully the pool table guy will call soon. As long as the basement, office / porch, one bathroom and one bedroom is done, we should be good to go. I'll post up before and after pictures once the dwelling is done.

Stay tuned,
Quilt & Bitch

2 comments:

p00lriah. said...

i don't know why but i'm getting excited for you. :)

it'd be totally cool if you guys get a table & set up a camcorder. nothing like watching your form on a screen to see what you're doing right/wrong. if you have a pool instructor, the table + camcorder setup can come in real handy.

i'm voting for virtual tour!! but only if you're okay with it. :)

Quilt+Bitch said...

I'll talk to hubby about streaming. We don't have a video camcorder... but there are always friends who we could borrow from.

Virtual tour... um... maybe...

We've put in a call for a delta rack, a table, we have the balls already, the huge area rug is coming in this Friday... I guess the whole house doesn't need to ready, just the basement... hehe.